Back to portal
Shower Door Return Report
to be completed by technician before leaving site
Work Order #
*
Date
*
Client's Name
*
Lead Installer
*
Status & Cause
What is done for each shower opening?
*
What is left to be done?
*
What happened to cause this problem?
*
Where Is Everything?
Where is all the glass?
*
Where is all the hardware?
*
Customer Communication
Has the customer been informed why we need to return?
*
Yes
No
What did you tell them? (or why not)
Handoff Briefing
Assume you are
NOT
the one going back, and you need to brief the next installer on what is going on.
PLEASE BE AS
DETAILED
AS POSSIBLE.
Photos
Site & problem photos
Tap to add photos
Up to 10 images · jpg, png, heic
A replacement panel is required
Check this if a glass panel needs to be re-ordered from the supplier
Replacement Panel Required
Order Item Number
(from vendor's tag)
What is incorrect with the piece we have?
(check all that apply)
Chipped
Scratched
Cutout(s)
Miter
Width
Height
Glass Type
Likely Mistagged
Other
Instructions for new piece
If a full drawing is necessary, attach a photo of the sketch below. Be specific with: sizes, outages, cutout locations.
Drawing includes:
Sizes
Outages
Cutout locations
Cancel
Submit to Office
Submitted to Office
Report received. The office will coordinate the return visit and any replacement panels.
Back to portal
Submit Another